Engineering High Headroom Laboratory

Location:
2225 East Mall
Date:
1992
Architect:
Formwerks
Architectural features:
This is a 1-floor building with painted cedar siding and concrete block.
Construction Type:
Concrete
Building users:
Department of Mechanical Engineering
Sources:
UBC Buildings (Campus Planning)

Alphabetical Index | Chronological Index